The subject of the contract included investor supervision during the construction of the road infrastructure of the Siedlce Shopping Park to ensure proper communication service for the emerging Stop Shop, KFC and Castorama facilities.

 

Characteristics

internal and access roads, asphalt, with a total length of almost 1,5 km,

pavements and walking paths made of concrete cubes,

sanitary and storm water drainage system, both gravity and pressure, with a total length of over 1,5 km,

water supply networks with a total length of 1.2 km,

lighting of roads and pavements,

construction of the bus terminal,

making the intersection of the commune and district roads with traffic lights and the necessary vertical and horizontal signs.

Road infrastructure Siedlce

Scope of works

Investor supervision of the road industry: management of the investment process on behalf of the Employer; conducting regular inspections at the construction site, checking the correctness of construction works in technical terms, compliance with the construction design, technical specifications and regulations, norms and principles of technical knowledge; inform the Employer in advance of any risks occurring during the implementation of the works, which may have an effect on extending the time of performance, reduction of quality of works, or increasing costs, as well as preventive and corrective actions taken.

Customer

Agreement of Investors: Castim Sp. z o.o., Stop Shop Poland Sp. z o.o., Transgourmet Polska Sp. z o.o.

End of works

March 2020

Exceptional Talent

Roads for shopping park Siedlce

  • +48 61 624 74 55
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

Wszelkie prawa zastrzeżone KKBud Sp. z o.o.

Wykonane przez: Empressia

  • +48 61 624 74 55
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

All rights reserved by KKBud Sp. z o.o.

Realization: Empressia