The subject of the contract was Project Management for the construction of a zero-emission warehouse with a concierge desk and an office building intended for the pharmaceutical industry in Mszczonów in Żyrardów poviat. The warehouse building built from scratch is a zero-emission facility in which the most modern solutions in the field of building ecology have been implemented in order to achieve CO2 neutrality, such as: photovoltaic installation; air source heat pump or appropriate insulation thickness. The building obtained the BREEAM certificate at the Excellent level with a score of 76,2%.
Characteristics of the object:
irregular shape resembling the letter "L", with dimensions in the axes 67.0x192.1m and 42.0x67.8m
15 305 m2
220 115 m3
15,20 m
23.2 × 12.6 m along the external outline of the structure
301 m2
with a diameter of 13m
for an octagonal-shaped tank in plan, dimensions: 14.0 × 14.0m
235
Damco Poland Sp. z o.o.
1,06 MW off-grid photovoltaic installation - the energy produced from the photovoltaic installation is fully used for the own needs of the newly established and existing facility.
Uninterrupted cold chain when unloading goods
Increased insulation of all partitions
Air source heat pump
Installation of sanitary and household water, sanitary and rain sewage systems
Installation of ventilation and air conditioning
Electric, gas, heating, sprinkler and hydrant installations
Smoke extraction installation, emergency and evacuation lighting, installation of earthing and equipotential bondings
Teletechnical installation
Installation of overvoltage protection, protection against electric shocks and lightning protection
Container for external fire fighting purposes
Rainwater retention reservoir
Wszelkie prawa zastrzeżone KKBud Sp. z o.o.
Wykonane przez: Empressia
All rights reserved by KKBud Sp. z o.o.
Realization: Empressia